The design changes MCS informed you about last February are underway. The gym lobby is being revamped to better showcase the great history and tradition of Middleburgh’s athletics program and student achievement.
Fundraising bricks in the Jr./Sr. High School Gym Lobby are being removed in preparation for the custom built trophy case that will be placed in that location. The bricks will be secured until they are repositioned this fall. The installation of the trophy case is scheduled for mid-October.